Pharmaceutical sector

Replacement of a chiller

PROJECT DESCRIPTION

As part of the replacement of a chiller in a pharmaceutical plant, TEKNEMA was responsible for the pre-purchase of the unit, contract management, installation and commissioning.

This work was carried out in synergy with Laporte experts conseils, who had been given the engineering mandate to draw up plans and specifications for replacing the chiller and modifying the operation of the chilled water network. The modifications provided better control of the plant’s chiller system.


Installation and connection of production equipment – Mechanical services and power plants (chilled water) – Low-voltage electrical services.

Installation and connection of supervisory instruments – Configuration of control equipment – Central control system – Programming of control sequences.

SERVICES PROVIDED BY TEKNEMA

PRECONSTRUCTION PHASE

  • Development, control and updating of construction schedule and budget
  • Execution plan evaluation
  • Professionals mobilization preparation
  • Logistical organization

COORDINATION OF TENDERS

  • Preparation of pre-purchase tender documents
  • Follow-up of bidding documents
  • Pre-selection of contractors and suppliers
  • Award of contracts

CONSTRUCTION MANAGEMENT

  • Control of budget, project accounting and construction schedule
  • Administration of construction contracts
  • Document management
  • Site management and follow-up
  • Work planning, supervision and coordination

COMMISSIONING

  • Control system verification
  • Production sequence execution
  • Operator training and start-up support

HEALTH AND SAFETY
The TEKNEMA team ensured that measures to safeguard the Health and Safety of personnel and facilities were put in place during the project.